Why GTA 6's Second Trailer Hasn't Been Announced, According to Ex-Rockstar Dev - IGN Daily FixFrom Swipe Right To Bottom Line: Hello Group's Contrarian GambleTedmos Launches its New Line of Rechargeable Puck Lights, Picture Frame Lights and Ceiling Lights. A Perfect Blend of Technology and Design for Modern HomesROSEN, A LEADING LAW FIRM, Encourages Hasbro, Inc. Investors to Secure Counsel Before Important ...
Fluence Energy, Inc. Announces Closing of Offering of $400.0 Million of Convertible Senior Notes due 2030The Aurora City Council on Tuesday night approved a roughly $660,000 project to renovate the fourth floor of Aurora City Hall that would bring together the city’s full Finance Department on one floor. The item was passed as part of the consent agenda, so the item was not discussed at Tuesday’s meeting. A $659,674 contract with a 10% contingency was awarded to Lite Construction Inc, the lowest responsible bidder, for the construction work. At a City Council I nfrastructure and Technology Committee meeting last week, Aurora Chief Public Facilities Officer Jim Birchall said the renovation would “demo everything” on the fourth floor and rebuild from a “clean envelope,” including bringing in completely new furniture, redoing the bathrooms and upgrading the lighting to LEDs. The Finance Department’s current offices, most of which are on the first floor of City Hall, are “antiquated, with awkward allocation of space, and inadequate infrastructure” to meet the city’s needs, according to a staff report included with the City Council’s meeting agenda. The fourth floor’s offices are also currently “hodgepodge,” with some being too big and some being too small, so the plan is to take down the walls and build back up six private offices and 14 cubicles, Birchall said at the time. The bathrooms on the fourth floor will also be remodeled, and the bathrooms on the third and fifth floors will be brought up to the current building code, which requires floor drains. The heating and cooling system would be controlled by a rooftop unit dedicated to the fourth and fifth floors, so the temperature could be adjusted down when people are not in the offices to avoid heating a vacant space, Birchall previously said. The city is currently working with Lite Construction on a different project, the renovation of 745 Broadway, according to Birchall. Although they aren’t too deep into the project, he is happy with the work they are doing, he said last week. Also, when they checked Lite’s references, some architecture firms that have worked with them in the past have been “very, very happy with them,” Birchall said at the time. The staff report from the City Council meeting agenda said the empty space on the first floor left when the Finance Department moves out can be repurposed or combined with the city clerk’s office. rsmith@chicagotribune.com
Trump Pick of Billionaire Feinberg for Pentagon Bolsters HegsethNonePrestige Wealth Inc. Announces Closing of Acquisitions of InnoSphere Tech and Tokyo Bay
友情提醒 |
本信息真实性未经本网证实,仅供您参考。未经许可,请勿转载。已经本网授权使用的,应在授权范围内使用,并注明“来源:本网”。 |
特别注意 |
本网部分文章转载自其它媒体,转载目的在于传递更多行业信息,并不代表本网赞同其观点和对其真实性负责。在本网论坛上发表言论者,文责自负,本网有权在网站内转载或引用,论坛的言论不代表本网观点。本网所提供的信息,如需使用,请与原作者联系,版权归原作者所有。如果涉及版权需要同本网联系的,请在15日内进行。 |